Samark Electrical were contracted by Saints Hockey Club to remove the timber light poles surrounding both fields and install six new twenty-meter steel light poles. Duties completed in conjunction with this project include, but were not limited to: Underground service locating, trenching & redirecting existing conduit and cable to new locations. Installation of concrete footings with rag bolt assembly cages. Installation of electrical pits to each new pole. Assembly and standing of new steel poles. Assembly and installation of field light fittings, as well as all associated electrical works including re-configuration of control wiring.